About Cast in Situ Piles in Bangladesh
The 25mm thick heavy steel tube is driven Along with the conclusion closed by a steel shoe. On reaching the demanded driving resistance, an entire duration cage is decreased in to the tube and stuffed with significant slump concrete. The tube is then vibrated out leaving a shaft of concrete.Log in to TheConstructor to ask issues, answer persons’s